Autodesk bulding systems tutorial


















If productivity gains are a goal of the software in fact - a selling point fabricated by the marketing dept. I could say more but I'll let you folks rebut I have missed something about Labels that I would welcome learning about. Message 2 of 3. Labels aren't necessarily "dumbed down" MvBlock tags. In some ways they are much smarted, in others they are dumber. Try to create an MvBlock tag that will get you the size of a rectangular or round duct, as well as the ID of a device with a single style.

Try to create a flow arrow with an MvBlock tag. Try to create an MvBlock tag that will get you the name or description of any building systems object to which you can apply it. Try to create an MvBlock tag that will "scale" with the annotation, or plot scale of the drawing technically you can do this, but it's a lot of work with display reps and block assignments.

Labels, as you have pointed out, also have masking abilities, not only for schematic lines, but also for any "one line" segment displayed in the "1 Line" display representation. They were meant to provide the 24x16 tags on ductwork and only that. Because MvBlock tags didn't have functionality that was needed for building systems, labels keep being "tacked onto" to provide additional functionality. After analytical spaces are assigned, you can run a systems analysis.

Revit uses a workflow to run the analysis. A workflow is a script that takes data from Revit , translates it to EnergyPlus, runs a simulation, and creates a report for design heating, cooling, and airflow.

Prerequisites Even if you are familiar with 3D modeling or other Autodesk software, watch the Essential Skills videos that are provided with Revit. Tutorial Videos A video is available for each tutorial. Topics in this section Part 1: Create a Project and Add Levels In this exercise, you start a project and create levels for the foundation, store floor, upper and lower parapets of the building model.

Part 2: Create Walls In this exercise, you work on different levels to add exterior walls, interior walls and a corridor to the project. Part 3: Create a Terrain and Building Pad In this exercise, you add a toposurface and a building pad to the building site. Part 4: Create a Floor In this exercise, you create a mezzanine in the store room area of the building.

If the objective was to understand how the ducts affect the temperature distribution, we would have included the duct wall parts in the geometry.

In this tutorial, we will explore how to use a centrifugal blower material and a cylindrical distributed resistance. Both of these material objects are sensitive to the settings applied on the Materials dialog, so please pay particular attention when defining these.



0コメント

  • 1000 / 1000